- Project ID
- P1.1
- Key Features
- Target beneficiaries are approximately 1500 individuals in Brgy Panalawan.
The spring intake system has a 2.4m wide Catch vent attached to the 1m by 1m for the Intake Box. A pump is also installed powered by Solar Panels. The reservoir has a dimension of 4.7m(L) by 4.7m(W) by 3m(H) on the ground line connected to communal tap stands.
- Type
- WATER SYSTEM
- Fiscal Year
- 2024
- Peace Table
- P1
- Implementing Unit
- MLGU
- Funding Agency
- OPAPRU
- Fund Source
- GAA 2024
- Amount Allocated
- ₱15,000,000.00
- Disbursed
- 100%
- Contract Cost
- -
- Length
- -